Lightning bolts are static electricity discharges, with which their formation is impossible to avoid. However, we can take measures to protect and prevent workers against the risk of electric shock by direct lightning impact.

In the Technical Note of Prevention (NTP) 1.084, published by the Spanish National Institute of Safety and Hygiene at Work and written with the assistance of Aplicaciones Tecnológicas, the main risks related to storm phenomena with electrical device are explained.

The electric shock by direct lightning impact on workers located in open areas can occur when work is carried out in open spaces in the presence of electrical storms, such as: agricultural or livestock tasks, installation of equipment on roofs, works on oil platforms, airports, ports, maintenance of power lines or wind turbines, edification during its construction, etc.

To protect against the risk of electric shock from direct lightning impact, according to the NTP 1.084 for the prevention of occupational risks caused by lightning strikes, there are permanent and temporary protection measures. Within the permanent protection measures are lightning rods andsurge protection devices, which require a fixed installation to the structures and equipment to be protected. Temporary measures, on the other hand, are those that are adopted when a local storm detection system warns of the imminent risk of lightning strike, but are then deactivated when the risk has disappeared. These temporary protection measures can complement the permanent ones, but never replace them.

In parallel to these protection measures, safety standards must be set and followed by all workers that are potentially exposed to the risk of electric shock by direct lightning strike.

Purchase the Certified Safety Manager Course

Related Posts

Chemical Incidents Aren’t Getting More Common. They’re Getting Deadlier.

Chemical Incidents Aren’t Getting More Common. They’re Getting Deadlier.

11.16.2026 Current Events
Late on Tuesday, October 20, Toledo Fire & Rescue ordered everyone within a mile of 1266 Progress Avenue to leave.…
Read More
Last Call to Update Your HazCom Program

Last Call to Update Your HazCom Program

11.16.2026 Compliance
OSHA revised the Hazard Communication Standard, 29 CFR 1910.1200, on May 20, 2024, bringing it in line with Revision 7…
Read More
Big Trouble in Big Trenches

Big Trouble in Big Trenches

11.16.2026 Current Events
October produced two enforcement actions in the same category, two thousand miles apart. In both, the ground gave way on…
Read More
cta1-img

Explore Our Live and Online Safety Courses

Learn at your own pace online or join an instructor-led live training session.